A full bathroom remodel usually takes 2 to 4 weeks once materials are on site. A one-day shower conversion, where a composite shower system replaces the old tub or shower in the same spot, is usually finished in a single day. Fort Collins Bathroom and Home Remodeling gives you a clear schedule with your quote, before any work starts.
Updated November 2026
Every job starts with a free in-home visit, usually the same week you call. We measure, talk through the layout and give you a flat-rate price and a schedule. Once you approve the design and the materials are on site, one crew handles the demolition, plumbing and installation through to the final walkthrough. Our full bathroom remodel page lists everything that is included.
One-day shower conversion: usually a single day.
Custom shower built from the studs: longer, because the valve, base and walls are all new. The schedule comes with your quote.
Full bathroom remodel: usually 2 to 4 weeks once materials are on site.
Where a job needs a permit, one of the two general contractors we work with pulls it, and we can tell you at the quote whether yours does.
Most of the time goes into work you will never see: taking the old bathroom out, the new plumbing and the waterproofing behind the walls. Moving the drain or the valve, changing the layout and waiting on materials all add days. The 2 to 4 weeks for a full remodel is counted from when your materials are on site.
Before and after, from remodels around Northern Colorado. More finished bathrooms are on our projects page.
What keeps a remodel on schedule, and what adds days.
When the shower stays in the same spot, a composite base and large wall panels go in with no grout to cure. Watch one finished in a day.
Reviews from our Google profile, word for word.
![]()
Franzia PerezTrustindex verifies that the original source of the review is Google.
Thanks Connor! It’s was great speaking with you. Provided me with a lot of helpful information. Would definitely recommend you guys!![]()
Judah CoferTrustindex verifies that the original source of the review is Google.
Taylor (the owner) is a great guy and works hard. I’d recommend his services!![]()
David HartmanTrustindex verifies that the original source of the review is Google.
Taylor and his crews are a great group of people! I would highly recommend working with them!![]()
Walter WillisTrustindex verifies that the original source of the review is Google.
Taylor and his team did a great job. 👍🏽![]()
Gracie SneedTrustindex verifies that the original source of the review is Google.
Very professional and efficient service!![]()
Levi wTrustindex verifies that the original source of the review is Google.
The customer service was excellent, couldn't have been happier. If you work with Taylor your day will be brightened! We need more local businesses like this!![]()
Jeremy BenintendeTrustindex verifies that the original source of the review is Google.
Taylor and his team are great to work with! Very knowledgeable and super hard workers. Definitely recommend!![]()
MikeTrustindex verifies that the original source of the review is Google.
Friendly, knowledgeable, and a great company to deal with!![]()
Terry HanniganTrustindex verifies that the original source of the review is Google.
Great company. Competitive pricing, Professional and reliable.
“They did a great job. The walk in shower is beautiful. I would highly recommend them for your bathroom project.”
“The shower is perfect and beautiful Love their materials!!”
We’ll respond within one business day.
Usually 2 to 4 weeks, counted from when your materials are on site. The schedule comes with your quote, so you know the dates before any work starts.
Yes, when the shower stays in the same spot. A one-day shower conversion fits a composite base and grout-free wall panels in place of the old tub or shower, usually in a single day.
Longer than a one-day conversion, because it is built from the studs out with a new valve, waterproof base and walls. You get its schedule with your quote.
Usually the same week you call. The in-home consult and the quote are free.
Moving the drain or the valve, changing the layout, and waiting on materials. That is why the 2 to 4 weeks for a full remodel counts from when the materials are on site.
Typical ranges, not a quote: every shower starts at $16,500, and a mid-range full remodel runs $25,000 to $30,000. Our cost guide has the full table.
Book the free in-home visit. You get a flat-rate price and a clear schedule before any work starts.