Remodel Timelines

How Long Does A Bathroom Remodel Take?

One day or a few weeks? What each kind of job takes and what sets the schedule, from the Fort Collins crew that builds them.

Quick Answer

How long does a bathroom remodel take?

A full bathroom remodel usually takes 2 to 4 weeks once materials are on site. A one-day shower conversion, where a composite shower system replaces the old tub or shower in the same spot, is usually finished in a single day. Fort Collins Bathroom and Home Remodeling gives you a clear schedule with your quote, before any work starts.

Updated November 2026

Step By Step

What happens during a full bathroom remodel?

A free in-home consult and quote

Design and approval

Demolition and new plumbing

Waterproofing, shower, vanity and floor

A final walkthrough together

Marble-look shower with black-framed glass in a Northern Colorado bathroom

Every job starts with a free in-home visit, usually the same week you call. We measure, talk through the layout and give you a flat-rate price and a schedule. Once you approve the design and the materials are on site, one crew handles the demolition, plumbing and installation through to the final walkthrough. Our full bathroom remodel page lists everything that is included.

By Type Of Job

How long does each kind of bathroom job take?

One-day shower conversion: usually a single day.
Custom shower built from the studs: longer, because the valve, base and walls are all new. The schedule comes with your quote.
Full bathroom remodel: usually 2 to 4 weeks once materials are on site.

Where a job needs a permit, one of the two general contractors we work with pulls it, and we can tell you at the quote whether yours does.

Planning Ahead

What makes a remodel take longer?

Most of the time goes into work you will never see: taking the old bathroom out, the new plumbing and the waterproofing behind the walls. Moving the drain or the valve, changing the layout and waiting on materials all add days. The 2 to 4 weeks for a full remodel is counted from when your materials are on site.

What sets your schedule:

Remodels We Have Finished

Before and after, from remodels around Northern Colorado. More finished bathrooms are on our projects page.

Bathroom before the remodel Bathroom after the remodel
Before
After
IMG_8138 IMG_8167
Before
After
IMG_0179 (1) Bathroom after the remodel
Before
After

Compare

What keeps a remodel on schedule, and what adds days.

Keeps It On Schedule

Adds Days

No pressure · No obligation · Free in-home quote

How can a shower be done in one day?

When the shower stays in the same spot, a composite base and large wall panels go in with no grout to cure. Watch one finished in a day.

What Homeowners Say About Working With Us.

Reviews from our Google profile, word for word.

4.8

Verified Reviews

Google review five-star rating
Google
Franzia Perez profile picture
Franzia Perez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Thanks Connor! It’s was great speaking with you. Provided me with a lot of helpful information. Would definitely recommend you guys!
Google
Judah Cofer profile picture
Judah Cofer
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Taylor (the owner) is a great guy and works hard. I’d recommend his services!
Google
David Hartman profile picture
David Hartman
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Taylor and his crews are a great group of people! I would highly recommend working with them!
Google
Walter Willis profile picture
Walter Willis
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Taylor and his team did a great job. 👍🏽
Google
Gracie Sneed profile picture
Gracie Sneed
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Very professional and efficient service!
Google
Levi w profile picture
Levi w
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The customer service was excellent, couldn't have been happier. If you work with Taylor your day will be brightened! We need more local businesses like this!
Google
Jeremy Benintende profile picture
Jeremy Benintende
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Taylor and his team are great to work with! Very knowledgeable and super hard workers. Definitely recommend!
Google
Mike profile picture
Mike
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Friendly, knowledgeable, and a great company to deal with!
Google
Terry Hannigan profile picture
Terry Hannigan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great company. Competitive pricing, Professional and reliable.
“They did a great job. The walk in shower is beautiful. I would highly recommend them for your bathroom project.”
Matt J., Google ★★★★★
“The shower is perfect and beautiful Love their materials!!”
Roxanna S., Google ★★★★★

Request your free quote

We’ll respond within one business day.

Questions, Answered

Bathroom Remodel Timeline Questions

How long does a full bathroom remodel take?

Usually 2 to 4 weeks, counted from when your materials are on site. The schedule comes with your quote, so you know the dates before any work starts.

Yes, when the shower stays in the same spot. A one-day shower conversion fits a composite base and grout-free wall panels in place of the old tub or shower, usually in a single day.

Longer than a one-day conversion, because it is built from the studs out with a new valve, waterproof base and walls. You get its schedule with your quote.

Usually the same week you call. The in-home consult and the quote are free.

Moving the drain or the valve, changing the layout, and waiting on materials. That is why the 2 to 4 weeks for a full remodel counts from when the materials are on site.

Typical ranges, not a quote: every shower starts at $16,500, and a mid-range full remodel runs $25,000 to $30,000. Our cost guide has the full table.

No Pressure · No Obligation

Want To Know How Long Yours Will Take?

Book the free in-home visit. You get a flat-rate price and a clear schedule before any work starts.